Regulatory

BNetzA determinations, the Prüfidentifikator catalog, and the legal basis behind each process.

The BNetzA rulings (BK6 / BK7), the Prüfidentifikator reference for all 17 EDI@Energy message types, and the legal basis each implementation rests on.

PageContent
Domain ModelParty roles (LF, NB, MSB, BKV, …), market objects (MaLo, MeLo, NeLo, NeBe), identifier formats, EDIFACT encoding
BNetzA Regulatory ReferenceBK6 / BK7 rulings, APERAK Fristen, process scopes
Process CatalogBusiness-level catalog of all MaKo processes — GPKE, WiM, GeLi Gas, MaBiS, Redispatch 2.0 — with message flows and implementation status
PID ReferenceComplete Prüfidentifikator table for all process families, including the DVGW gas transport PIDs

Regulatory framework coverage

graph LR
    BNetzA["BNetzA<br/>Rulings"]

    subgraph strom ["Strom frameworks"]
        BK6_24["BK6-24-174<br/>GPKE + MaBiS"]
        BK6_22["BK6-22-024<br/>LFW24 · GPKE Teil 4"]
        BK6_20["BK6-23-241 · BK6-20-059<br/>Redispatch 2.0"]
    end

    subgraph gas ["Gas frameworks"]
        BK7_24["BK7-24-01-009<br/>GeLi Gas 3.0"]
        BK7_14["BK7-24-01-008<br/>GaBi Gas 2.1 (DVGW)"]
    end

    subgraph retail ["Retail / LF"]
        ENW41["§41 EnWG<br/>Preisgarantie · Kündigung"]
        EEG["EEG 2000–2023<br/>KWKG · 10 schemes"]
        SOLA["§42b EnWG<br/>GGV Solarpaket I"]
    end

    subgraph transport ["Transport & Metering"]
        AS4["AS4-Profil v1.2<br/>BrainpoolP256r1"]
        BSI["BSI TR-03109<br/>iMSys · §14a CLS"]
        MsbG["§ 60 Abs. 1 MsbG<br/>Aufbereitung · Ersatzwert"]
        NNNEV["StromNEV/GasNEV/KAV<br/>Grid charges"]
    end

    BNetzA --> strom
    BNetzA --> gas

    BK6_24 -->|"mako-gpke<br/>mako-wim<br/>mako-mabis"| GPKE_impl["GPKE Teil 1–4<br/>WiM Strom · MaBiS"]
    BK7_24 -->|"mako-geli-gas<br/>mako-wim"| GAS_impl["GeLi Gas 3.0<br/>WiM Gas"]
    BK7_14 -->|"mako-gabi-gas<br/>dvgw-edi"| DVGW_impl["ALOCAT · NOMINT · NOMRES · SSQNOT<br/>GaBi Gas 2.1"]
    ENW41 -->|"vertragd"| LF_impl["B2C/B2B contracts<br/>GDPR Art. 15/17/20"]
    EEG -->|"eeg-billing<br/>einsd"| EEG_impl["10 settlement schemes<br/>§14 UStG Gutschrift"]
    BSI -->|"metering<br/>edmd"| IOT_impl["SmgwSession<br/>ClsChannel"]
    MsbG -->|"metering<br/>edmd"| SUB_impl["vee validation<br/>Ersatzwerte · Forecast"]
    NNNEV -->|"grid-billing<br/>netzbilanzd"| NNE_impl["NNE/KA/MMM<br/>§14a Modul 1/2/3"]

Implemented regulatory frameworks

RegulationDomainImplementation
BK6-24-174 (GPKE Teil 1–3 = Anlagen 1a–1c, WiM Teil 1/2 = Anlagen 2a/2b, MaBiS = Anlage 3, in force 06.06.2025)Strommako-gpke, mako-wim, mako-mabis
BK6-22-024 (GPKE Teil 4 = Anlage 1d)Strommako-gpke
BK6-22-024 (LFW24 — 24h-Lieferantenwechsel, §20a EnWG; re-issued GPKE Teil 2 + Teil 4, MPES absorbed into GPKE, in force 06.06.2025)Strommako-gpke
BK7-24-01-009 (GeLi Gas 3.0, BK7 Beschluss 12.09.2025)Gasmako-geli-gas, mako-wim
BK7-24-01-008 (GaBi Gas 2.1 — Kapazitätsabrechnung, DVGW)Gasmako-gabi-gas, dvgw-edi
PARTIN AHB 1.0f (Kommunikationsdaten Strom + Gas)Bothmako-gpke (37000–37006), mako-geli-gas (37008–37014)
§42b Abs. 5 EnWG (Solarpaket I — GGV Gemeinschaftliche Gebäudeversorgung)Strommetering crate (allocation::community::allocate, allocation::formula::Formula), edmd
Residuallast (ordinary supply, no special §)Strommetering crate (Residual rule), edmd
EEG 2000–2023 / KWKG (Feed-in settlement)Stromeeg-billing crate (10 schemes), einsd
§14 Abs. 2 UStG (Gutschriftverfahren — NB issues the EEG Gutschrift)Stromeeg-billing (settlement_to_gutschrift), einsd (rechnung_json)
§ 60 Abs. 1 MsbG (der MSB hat die erhobenen Daten aufzubereiten und zu übermitteln — Plausibilisierung und Ersatzwertbildung; Abs. 2 Satz 2 lets that happen outside the Smart-Meter-Gateway)Bothmetering crate (vee::validation, vee::substitute), edmd
§ 40a Abs. 2 EnWG (Verbrauchsschätzung) · § 13 Abs. 1 StromGVV (Abschlagshöhe)Strommetering::project_annual_consumption, edmd /api/v1/forecast
BSI TR-03109 (iMSys / SMGW lifecycle, §14a CLS channels)Strommetering (SmgwSession, ClsChannel), edmd
StromNEV / GasNEV / KAV (grid charge settlement)Bothgrid-billing crate, netzbilanzd
§14a EnWG (Steuerbare Verbrauchseinrichtungen — Modul 1/2/3)Stromgrid-billing (Sect14aModule), processd (produktcode check, GPKE Teil 3 Kap. 1.3)
§41 EnWG (Vertragsinhalte, Abs. 5 Preisänderungs-Unterrichtung + Sonderkündigungsrecht) / §5 Abs. 2 StromGVV/GasGVV (6-Wochen-Frist)Bothvertragd
§41a EnWG (Dynamic tariffs — EPEX Spot day-ahead)Stromproductd (EPEX prices), billingd (§41a iMSys guard)
GDPR Art. 15/17/20 (data export, pseudonymization, portability)—vertragd (/export, /anonymize), accountingd (/anonymize)
XRechnung 3.0 CII / PEPPOL UBL (EN 16931 e-invoice)—billingd
BK6-20-160 Anlage 6 (NZR-EMob / Modell 2 — ladevorgangscharfe bilanzielle Energiemengenzuordnung) · BK6-24-267 (Modell 2 für Kundenanlagen, § 20 Abs. 1, 1a EnWG)Strommako-emob (allocation engine + the three Modellwechsel-Workflows), mako-mabis (Zuordnung ZP der NGZ zur NZR, 55235–55237), makod (routing, adapters, UTILMD render), marktd (malo.abwicklungsmodell), mako-pruefung (E_0510–E_0513), mako-fristen, edi-energy (UTILMD 55235–55243, MSCONS 13018), mako-engine (Marktrolle::Lpb)
BK6-20-059 TZ 2 (Redispatch 2.0 Datenformate; TZ 1, BK6-20-060 and BK6-20-061 repealed by BK6-23-241)Strommako-redispatch (8 workflows), redispatch-xml (9 document types), makod (AS4 EDIFACT+XML ingest), grid-billing (§13a Vergütung)
BK6-23-241 (BilAReM, Beschluss 07.05.2026 — Planwert-/Prognosemodell, Kap.-3 Ausfallarbeit)Strommako-redispatch (bilarem model/migration + ausfallarbeit engine), grid-billing (bilarem_finanzielle_korrektur), netzbilanzd (compute endpoints)
§19 Abs. 2/3 StromNEV + BK8-25-003-A / GBK-25-01 (AgNeS, draft)Stromgrid-billing::regulatory (regime turnovers as dates; AgNeS-era Entgelt settlements are refused — no Rahmenfestlegung supplies their parameters)
§20b EnWG (Netzzugangsplattform, G. v. 18.12.2025 — no Festlegung or API exists)Bothmakod (netzzugang.* commands, outbox-reliable sender + signed ERP-webhook fallback), marktd (netzzugang_antraege registry)
BDEW AS4-Profil v1.2 (BrainpoolP256r1, sign+encrypt, ECDH-ES AES128-GCM)—mako-as4
§ 20 Abs. 1 S. 1 EnWG (diskriminierungsfreier Netzzugang) + § 6a / § 7a Abs. 5 EnWG (informatorische Entflechtung, Gleichbehandlungsbericht by 31 March)Bothobsd (GET /api/v1/audit/gleichbehandlung), Cedar ABAC
MsbG §29 Abs. 3 / BSI TR-03109-4 §6.3 (SMGW certificate expiry monitoring)Stromedmd daily cert-expiry worker — tiered 90/30/7-day de.messwert.smgw.cert.expiry-warning (dedup per tier); agentd smgw-diagnostics-agent escalates renewal

Format version coexistence. Profiles are per message and fv-dated — fv20260401 binds from 01.04.2026, fv20261001 from 01.10.2026. The directory names the Anwendungszeitpunkt; Allgemeine Festlegungen 6.1d §2.5 schedules publication six months earlier, and a deviating date must name the Mitteilung that published it. Several format versions run in one instance, and a process finishes under the version it started with.

PID coverage. crates/edi-energy/tests/it/skeletons.rs generates a minimal message per Anwendungsfall from its Prüfschablone and validates it; cargo xtask check-pid-coverage holds the shipped columns against BDEW's published Anwendungsübersicht and reports the count.

Antwortcode fidelity. cargo xtask validate-ebd-codes holds every answer code mako can send against the BDEW Entscheidungsbaum-Diagramme und Codelisten PDF: the tree publishes the code, and the Cluster mako assigns it is the Cluster the document prints — A01 is an Ablehnung in E_0510 and a Zustimmung in E_0511/E_0512. The check needs the mirrored PDF (cargo xtask sync-regulatories --download) and skips without it.