Documentation
Run the standalone estate to try an operator shift and sign in as a payer. To embed the Rust libraries, start with Getting started. The interface reference covers service contracts and event delivery. The glossary explains charging and billing terminology.
Getting started
Try emob with just demo, then walk one EV charging session in Rust: verify Eichrecht OCMF meter values, price it under AFIR, build a CDR and an e-invoice.
Run the estate
Run the emob EV charging estate: just demo, one estate.toml, OCPP TLS, signed journal heads, a witness, Heute, the OCMF receipt and the XRechnung invoice page.
The Eichrecht chain
How emob verifies OCMF signed meter values under German Eichrecht (MessEG §33): key registry, chain checks, energy vs duration, and the transparency file.
The OCPP seam
How emob turns OCPP 1.6, 2.0.1 and 2.1 transaction events into Eichrecht-signed CDRs, and pushes the same tariff to the charge point display via OCPP 2.1.
Sessions and settlement
EV charging settlement in emob: an exact quarter-hour split, a validated CDR roaming partners settle against, and the EN 16931 e-invoice and SEPA collection.
Tariffs and price transparency
EV charging tariffs in emob: one object rates the session and displays the price, with OCPI tier rules, VAT breakdown and AFIR Art. 5 price transparency checks.
Locations and the national access point
AFIR Art. 20 charge point data for the Mobilithek: one inventory feeds DATEX II and OCPI Locations, priced by the tariff that rates each EV charging session.
Roaming
EV roaming with OCPI 2.3.0, 2.2.1 and OICP 2.3 (Hubject) from one canonical CDR: lossy conversions reported, false ones refused, partner CDRs pre-flighted.
Plug & Charge
ISO 15118-2 and -20 Plug & Charge for CPOs and EMPs: contract chains verified under named PKI roots, the eMAID read off the certificate, revocation status.
§ 14a and the grid
§ 14a EnWG smart charging: which charge points a grid operator may curtail, EEBUS LPC setpoints as exact decimals, and allocation under an OCPP 2.1 ceiling.
Bidirectional charging and MiSpeL
Bidirectional EV charging under MiSpeL: levy netting per month on quarter-hour values (Abgrenzungsoption A2/A11), the Pauschaloption and Rumpfmonate, in Rust.
The obligation calendar
EV charging compliance as code: AFIR, ISO 15118-20, LSV, PAngV, MessEG, THG-Quote, MiSpeL, § 14a, NIS2, CRA — dated, cited duties per charge point and company.
Testing with emobtest
A Python toolkit on emob's crates: stations and cars that drive a CSMS, a meter, the invoice's rating, an event inbox, and conformance suites.
Architecture
emob architecture: sans-I/O Rust crates for Eichrecht, OCPP, OCPI and billing; eleven daemons connected by APIs and signed CloudEvents.
Replace an integration
The HTTP, event and MCP contracts, who serves each one, and how to verify a replacement.
Glossary
EV charging terms explained: CPO, eMSP, OCPP, OCPI, OCMF, Eichrecht, AFIR, CDR, eMAID, THG-Quote, MiSpeL, Rumpfmonat, signed journal head, witness and more.