Glossary

EV charging terms explained: CPO, eMSP, OCPP, OCPI, OCMF, Eichrecht, AFIR, CDR, eMAID, THG-Quote, MiSpeL, Rumpfmonat, signed journal head, witness and more.

The words this documentation uses, each in one or two sentences. Terms from German law keep their German name, because that is the name in the text that binds.

Market roles

CPO — charge point operator

Runs charging stations: installs them, connects them to a back office, sets the ad-hoc price, and is responsible for the meter and its calibration.

eMSP / EMP — e-mobility service provider

Holds the driver’s contract and charging card or app, authorises sessions on other operators’ stations through roaming, and invoices the driver.

Roaming hub

A platform that connects many CPOs and eMSPs so each does not need a contract with every other — Hubject (OICP) and GIREVE are the large European ones.

Durchleitung (Modell 2)

A German model in which the driver’s own electricity supplier delivers the energy at a public charge point and the CPO is paid for the charging service. It separates the station from the supplier and is settled in quarter hours through market communication.

Protocols and formats

OCPP — Open Charge Point Protocol

The protocol between a charging station and its back office (the CSMS, charging station management system): boot, authorisation, transactions, meter values, tariffs, smart-charging profiles. Versions 1.6J, 2.0.1 and 2.1.

OCPI — Open Charge Point Interface

The roaming protocol between CPOs and eMSPs: locations, tariffs, tokens, sessions and charge detail records. 2.3.0 is the current version; 2.2.1 is widely deployed.

OICP — Open InterCharge Protocol

Hubject’s roaming protocol, spoken through its hub over mutual TLS.

CDR — charge detail record

The record of one finished session — energy, time, location, price and identifiers — that a CPO and an eMSP settle against.

OCMF — Open Charge Metering Format

The format in which a calibrated meter signs each reading, so anyone with the meter’s public key can check later that the value was not altered.

eMAID and EVSE ID

The contract identifier of a driver (eMAID, e.g. DE-ABC-C12345678-X) and the identifier of a charging point (EVSE ID, e.g. DE*ABC*E00001).

ISO 15118 and Plug & Charge

The protocol between vehicle and station. Its Plug & Charge mode lets the car authorise itself with a contract certificate, issued under a public key infrastructure (PKI) such as Hubject’s.

EEBUS

The protocol a German grid operator’s control box speaks to reduce a site’s power under § 14a EnWG.

DATEX II

The European format for traffic data, used for the charging data AFIR requires operators to publish through the national access point (in Germany: the Mobilithek).

EN 16931, XRechnung and ZUGFeRD

EN 16931 is the European standard for electronic invoices, with two syntaxes: UBL and CII. XRechnung is the German profile of it; ZUGFeRD wraps a CII invoice inside a PDF.

SEPA direct debit (pain.008)

The ISO 20022 message a bank accepts to collect money from a customer’s account under a signed mandate.

Law and regulation

AFIR

The EU Alternative Fuels Infrastructure Regulation (EU) 2023/1804: ad-hoc payment, price transparency, card payment at fast chargers, and the data operators must publish [AFIR Art. 5(1)] [AFIR Art. 20(2)].

Eichrecht

German calibration law (MessEG and MessEV). For charging it means a measured value may only be billed if the customer can check it, long after the session [MessEG §33].

PTB-A 50.7 and the transparency file

The PTB’s requirements for charging equipment that meters and signs values [PTB-A 50.7]. The transparency file carries the signed values and the key, and the free S.A.F.E. Transparenzsoftware verifies it.

Ladesäulenverordnung (LSV)

The German charging-point ordinance: technical minimums and the duties to notify the Bundesnetzagentur [LSV26 §4].

PAngV

The German price indication ordinance: the price per kilowatt-hour must be shown at the charge point [PAngV §14(2)].

§ 14a EnWG and SteuVE

The German rule that lets a grid operator reduce the power of a controllable consumer (steuerbare Verbrauchseinrichtung, SteuVE) — such as a non-public wallbox — while guaranteeing it a minimum.

THG-Quote

The German greenhouse-gas quota: electricity delivered at public charge points can be credited to fuel suppliers, under conditions set by the 38. BImSchV [38k §6(3)].

MiSpeL

The Bundesnetzagentur’s ruling for storage and bidirectional charging points (in effect 21.10.2026): how much of a site’s grid draw is relieved of levies because a store fed it back [MiSpeL A1 3.2.5]. See Bidirectional charging.

Abgrenzungsoption

MiSpeL’s measured option (Anlage 1): the fed-back energy is told apart from the drawn per calendar month on quarter-hour meter values, under a Formelsatz — A2 with a meter behind the points, or A11 with the grid meter alone.

Pauschaloption

MiSpeL’s flat option (Anlage 2): a yearly allowance from the installed solar power and a factor of 0,2 for a charge point. It applies only from the month after the European Commission’s state-aid approval, so emob refuses it until then [MiSpeL Tenor 9].

Rumpfmonat

A part month: when an installation is first assigned mid-month, the rest of that month takes the calendar month’s place [MiSpeL A1 11]. The yearly counterpart is a Rumpfjahr.

NIS2 and the Cyber Resilience Act

NIS2 sets cybersecurity duties for undertakings in the energy sector, including charge point operators [NIS2 Art. 21(2)]. The Cyber Resilience Act sets duties for software and devices placed on the EU market, including vulnerability reporting [CRA Art. 14].

Running the estate

Estate (estate.toml)

The one file every emob daemon reads its own sections of: stations, meter keys, tariffs, partners, contracts, operators and addresses. Secrets are not in it — a field ending in _env names the environment variable that holds one.

Outbox

csmsd’s journalled list of deliveries: each settled session is sent to billd, roamd and every subscriber that takes it as a signed CloudEvent and retried until acknowledged, so a restart loses none.

Subscriber

A system outside the estate that receives emob’s CloudEvents, named in [[subscribers]] with its URL, its own signing secret and the types it takes.

Read model

A daemon’s operator view of its state, readable only with an operator token. csmsd, billd and roamd serve a bounded view at GET /v1/<daemon>/today — counts and the newest items that need a person — so its size does not grow with history. The operator page is built from them.

Actor

Who caused a journal fact or a logged request: station:<identity>, partner:<party>, operator:<name>, service:<daemon>, timer or estate. Taken from what the daemon authenticated, and part of each record’s digest.

Signed head

Where a journal ends — its position and the hash there — signed with the daemon’s Ed25519 key after every append, kept in <journal>.head and served at GET /v1/<daemon>/head. A daemon refuses to start from a journal shorter than its signed head.

Signed note

The C2SP text format a signed head is written in: an origin line, the size, the base64 hash, and a signature line any signed-note verifier can check.

Witness

A copy of the signed heads that no daemon’s volume holds — kept by deskd and emob witness. It alarms when a head goes backwards, forks or comes under another key, and the alarm stays until its file is moved aside.

Security profile

How an OCPP station proves who it is: 1 — HTTP Basic, 2 — Basic over TLS, 3 — a TLS client certificate. Set per station in the estate.

Data key and crypto-erasure

Each daemon’s 32-byte key that seals what it writes to its journal, so no card UID or credential is on disk in clear. Destroying a key makes what it sealed unreadable — for empd’s card UIDs that is deliberate erasure (crypto-erasure), because an append-only journal cannot be edited.

Heute

“Today” — the operator’s page (deskd): what needs a person today, in order, headed by the charging success rate.

Ladeerfolg — charging success rate

Records settled ÷ sessions attempted, counted from the ledger that bills, per calendar day in the estate’s time zone (each attempt dated when the platform decided it, not by the station’s clock), with failures by cause: authorisation, evidence, station fault, cancelled. Unlike uptime, it counts what the driver experienced.

Warum?

“Why?” — on Heute, a refused session’s evidence findings, worded, each citing the paragraph that refused it and saying what would have made it billable.

Ladebeleg — the driver receipt

The page at /r/<token> for every session: the verdict, energy, price lines, the meter key, the transparency file and an in-browser check of every signed value.

Transparenzdatei — transparency file

The S.A.F.E. XML file holding a session’s signed OCMF records and the meter’s public key, which the independent Transparenzsoftware (or emob verify) checks.

Zähler-Schlüssel — meter key

The calibrated meter’s public key. The receipt prints it in groups of four so the driver can compare it with the label on the charge point.

Getting started · Run the estate · Eichrecht · Compliance