§ 14a and the grid ✅

§ 14a EnWG smart charging: which charge points a grid operator may curtail, EEBUS LPC setpoints as exact decimals, and allocation under an OCPP 2.1 ceiling.

Since 1 January 2024, § 14a EnWG lets a German distribution grid operator reduce the draw of a steuerbare Verbrauchseinrichtung (SteuVE, a controllable consumer device) — which includes a non-public charge point over 4.2 kW on the low-voltage grid. In return the site keeps a guaranteed minimum draw and pays a reduced grid fee [EnWG §14a] [BK6-22-300]. emob splits this into three crates: emob-smart decides which points the rule reaches and what the site may draw; emob-eebus reads the grid operator’s setpoint off the EEBUS wire; emob-ocpp sends the result to each charge point as an OCPP 2.1 charging profile.

Which charge points § 14a covers: public ones are excluded

[BK6-22-300 Ziff. 2.4.1] — the Bundesnetzagentur’s ruling under § 14a — defines the device it covers as

ein Ladepunkt für Elektromobile, der kein öffentlich zugänglicher Ladepunkt im Sinne des § 2 Nr. 5 der Ladesäulenverordnung (LSV) ist

A publicly accessible charge point is not a SteuVE. The forecourt fast charger is outside § 14a; the depot, the workplace car park and the fleet yard are inside it. A platform that curtails a public charger because a grid operator asked breaks its promise to a driver over a duty that does not exist.

SteuVe::of reads the conditions — accessibility, grid level, rated power above THRESHOLD_KW — off the same charge-point facts the compliance calendar judges, and returns NotSteuVe with the reason otherwise. A compliance answer and the load manager therefore cannot disagree about whether the statute applies.

What the LPC state tells the operator

The Festlegung is implemented over the EEBUS use case Limitation of Power Consumption [LPC §2.3.2], which gives a controllable system five states:

StateWhat it meansWhat the operator does
no Energy Guardno control box commissionednothing
initcommissioned controller waiting for a heartbeat and limitcheck the pairing and configured failsafe power
limiteda setpoint is in forceobey it
unlimited/controlledthe grid operator is connected and allows full power [LPC-905]nothing
failsafe state120 seconds since the last heartbeat in either controlled state [LPC-911/912]check connectivity and heartbeat timestamps
unlimited/autonomousthe silence has outlasted [LPC-022]’s release, two to 24 hourstell the grid operator it cannot curtail this site

A timed limit expires at its own deadline during healthy communication. Updating only the watts preserves that deadline. A heartbeat alone cannot restore an old setpoint after loss. The site enters autonomous operation after its configured failsafe residence, measured from the 120-second threshold. The library exercises these transitions through allocation and the resulting OCPP profiles. EEBUS LPC specification

Reading the EEBUS setpoint as an exact decimal

The minimum draw (Mindestleistung) is 4.2 kW [BK6-22-300 Ziff. 4.5]. Three-phase at 6 A — the lowest current the DIN EN 61851-1 control pilot can signal — is 4.14 kW. Sixty watts apart, and a platform must tell them apart to show it honoured the claim.

SPINE (the EEBUS data model) carries power as a ScaledNumber: an integer mantissa and a power of ten, which is a decimal. Converting it to f64 loses that — 70 % of 9.9 kW is 6930.000000000001 in f64, which is why eebus holds its limits as ScaledNumber since 0.13. emob_eebus::watts_of reads one into a Decimal, exactly:

use emob_eebus::watts_of;

assert_eq!(watts_of(&ScaledNumber::new(42,  2)), Some(Decimal::from(4200)));
assert_eq!(watts_of(&ScaledNumber::new(414, 1)), Some(Decimal::from(4140)));

A scale no decimal can hold returns None and the write is NACKed, not approximated: scale is a signed 16-bit number the peer chooses, and a substituted value would be a limit nobody asked for, applied to a site that will obey it. This mirrors the OCPP seam — the protocol library handles the communication; the number that decides anything comes from an exact source.

Allocating power under the grid operator’s ceiling

Allocation has no public constructor. emob_smart::allocate is the only way to get one, it takes the grid limit, and every market plan — a tariff optimiser, a departure schedule, a fleet scheduler — enters as a Demand:

use emob_smart::allocate;

let allocation = allocate(&site, &market_plan, &grid_limit);
assert!(allocation.total_kw() <= allocation.ceiling_kw());
assert!(allocation.within_ceiling());

This is [BK6-22-300 Ziff. 4.6]’s priority rule — the grid operator’s reduction outranks market-driven load control (marktliche Laststeuerung) — made structural: no allocation exists that did not pass through the ceiling.

Two more rules:

Sending the limit as an OCPP 2.1 charging profile

emob_ocpp::to_charging_profiles turns an allocation into OCPP 2.1 charging profiles. OCPP resolves overlapping profiles by purpose first, stack level second. ChargingStationExternalConstraints is the purpose reserved for an external actor such as a distribution grid operator. Sent as a TxDefaultProfile instead, the grid limit would share a tier with the optimiser it must outrank, and the station would decide between them by a stack level someone typed.

So the purpose is fixed, not a parameter, and the stack level is zero: there is only ever one external constraint.

Three facts an allocation holds have no field on that wire, and each is reported in the crossing’s notes rather than dropped: the site ceiling (OCPP addresses EVSEs, not sites), the headroom (“we held you down” versus “nobody was plugged in”), and which full-power state the site is in.

The evidence § 14a asks for

[LPC §4.1.5] makes the pair the operator’s evidence: what the grid operator asked for, and what was answered. A setpoint nobody can show was honoured was not honoured; an allocation with no instruction behind it is a site throttling itself. The sited library keeps that pair in order, refusals included (Sited::log).

sited: the site controller runs at the edge

sited is the one service designed to run at the site rather than in a data centre. A controller behind a broken WAN link would hold a site at 4.2 kW because the process could not be reached, not because a grid operator asked.

Northbound it speaks SHIP over TLS 1.2 (EEBUS); southbound, OCPP. The rules live in the crates and the daemon holds none of them, so the whole exchange — including the commissioning [LPC §3.3] prescribes — runs as an ordinary test with two engines, real datagrams and time as a variable. The sited daemon starts with an empty site and shows its LPC state to operators (GET /v1/sited); ⏳ the SHIP session and the OCPP leg are not wired.

Related: The OCPP seam · Compliance · Sessions and settlement · Glossary