Bidirectional charging and MiSpeL ✅
Bidirectional EV charging under MiSpeL: levy netting per month on quarter-hour values (Abgrenzungsoption A2/A11), the Pauschaloption and Rumpfmonate, in Rust.
MiSpeL is the Bundesnetzagentur’s ruling (Festlegung 618-25-02, adopted
01.10.2026) on how much of a storage site’s grid draw is relieved of levies —
and a bidirectional charge point is a store [MiSpeL A1 3.2.5]. Energy a car
feeds back is saldierungsfähig: the levies on that much of the site’s grid
draw fall to zero [MiSpeL Tenor 1]; everything else drawn stays levied,
including what the cars drove away with. emob_session::mispel computes that
split for a month or a year, to the digit of the ruling’s own worked examples,
and refuses by name whatever the ruling does not allow it to net.
Too large a figure keeps money the levies were owed; too small pays twice. So the module keeps every intermediate figure, numbered as in the Festlegung, because a Nachweis (the evidence filed with the grid operator) is checked by somebody re-deriving it.
Two options: Abgrenzungsoption and Pauschaloption
| Option | Period | Function | Formelsatz |
|---|---|---|---|
| Abgrenzungsoption (Anlage 1) — measured, per quarter hour | calendar month, or Rumpfmonat | emob_session::mispel::month | A2: grid meter Z1 plus a meter Z2 behind the points, formulas (1)–(21); A11: Z1 alone, where no other generation sits behind the connection |
| Pauschaloption (Anlage 2) — a flat allowance | calendar year, or Rumpfjahr | emob_session::mispel::pauschal_year | P2: one bidirectional point and a solar plant of at most 30 kWp, factor 0,2 |
Under A2, the grid draw in each quarter hour goes to the points first, and the
feed-in comes out of the points first. Energy a car brought from elsewhere
(Fremdtankstrom) is taken back out, and a charge point’s storage efficiency
is presumed to be 85 % [MiSpeL A1 (14)]. The levy-reducing quantity is never
larger than the month’s grid draw. Under P2, the allowance
is 500 kWh per kWp of solar [MiSpeL A2 (P1)], prorated to the period, and only
feed-in in quarter hours with a non-negative spot price counts [MiSpeL A2 (P5)].
Only the levy side is modelled. The other half of the ruling, the förderfähige Netzeinspeisung, is a premium-supported plant operator’s market premium and plays no part without such a plant. A stationary battery is not modelled either.
Netting a month
use emob_core::Formelsatz;
use emob_session::mispel::{self, Conditions, Site};
use std::collections::BTreeSet;
use time::macros::date;
let site = Site { formelsatz: Formelsatz::A2, covered: BTreeSet::from([evse.clone()]) };
let conditions = Conditions {
assigned_from: date!(2027-11-01),
first_assignment: false,
operator_consent: false, // not needed from 01.10.2027
state_aid_approved_on: None,
};
// `grid`: every quarter hour of the grid meter Z1; `sessions`: (EvseId, SessionSplit).
let month = mispel::month(2027, time::Month::November, &site, &conditions, &grid, &sessions)?;
println!("relieved {} kWh, still levied {} kWh", month.levy_reducing, month.levied_grid_draw);
The grid series (GridQuarter: draw, feed-in, whether the spot price was
negative) comes from the metering operator and is never derived from sessions.
The point’s quarter hours are the same SessionSplit that
settlement bills, with import and export kept apart until
the formula takes the minimum — nothing nets a draw against a discharge before
the Festlegung does.
When the rules govern: the Tenor window
emob_session::mispel::governed turns the ruling’s operative part (Tenor)
into the one window a settlement may cover. Every condition is a declared
input in Conditions; nothing is assumed.
| Date or condition | Rule |
|---|---|
| 21.10.2026 | the ruling takes effect with its publication [MiSpeL Tenor 8] |
| until 30.09.2027 | it applies only with the grid and metering operators’ consent [MiSpeL Tenor 9] |
| Pauschaloption | only from the first day of the month after the European Commission’s state-aid approval of § 19 Abs. 3c EEG — and not at all while there is none [MiSpeL Tenor 9] |
| a switch of an installation already assigned | only on the first day of a month |
| a first assignment mid-month | allowed; the rest of the month is a Rumpfmonat, which takes the calendar month’s place [MiSpeL A1 11] |
Months are counted in German legal time: a month’s quarter hours are those starting on a Europe/Berlin day of the window, so the 92- and 100-quarter-hour days of a clock change are counted, not assumed.
What is refused, and why
Each refusal is a mispel::Refusal variant whose message names the rule:
- Before the rules or the assignment — a period that ends before 21.10.2026, or before the installation was assigned.
- Missing consent — a period before 01.10.2027 without the operators’ consent.
- No state aid — the Pauschaloption while no approval date is known, or before the month after it. There is no approval yet, so today every Pauschaloption year is refused.
- Mid-month switch — an installation already assigned that switches on any day but the first.
- Uncovered discharge — a point the declared metering concept does not
cover fed back: a discharge no approved Formelsatz sees cannot be netted
[MiSpeL A1 3.2.5]. A unidirectional point may only draw and stays out of Z2. - Interpolated quarter hour — a covered point’s slot whose energy was interpolated, not measured, under A2: the ruling nets measurements.
- Incomplete grid series — a grid meter series missing a quarter hour of the window, or holding one twice: a missing quarter hour of draw is levied draw that vanishes.
- No solar, or more than 30 kWp — outside the Pauschaloption.
In the compliance calendar
Two calendar entries are entitlements, not duties: a point that feeds back
without them breaks no law but pays the levies on all of its grid draw.
ChargePointProfile::mispel (a MispelPosture: bidirectional, the
Formelsatz, operator consent) decides both.
| Entry | Source | From | Satisfied when |
|---|---|---|---|
mispel-metering-concept | [MiSpeL A1 3.2.5] | 21.10.2026 | a bidirectional point’s site has a Formelsatz (A2 or A11) |
mispel-operator-consent | [MiSpeL Tenor 9] | 21.10.2026–30.09.2027 | the grid and metering operators consented |
Status
✅ The month and the year are built in emob-session and tested against
Anlage 1’s Beispielrechnungen 1 and 2 to the digit, Anlage 2’s Rumpfjahr
example, every refusal, and a property over 500 seeded months. ⏳ No daemon
nets a month and Heute shows no MiSpeL figures: that needs a grid-meter series,
which no daemon receives.